Project 01 of 07
Software Revision Automation
Commercial aviation configuration planning
Value delivered
Money
$56K
3-year value ($18K a year)
Time
144 hrs
a year of manual work removed
Speed
Minutes
to re-run allocations, down from hours
Risk
0
single-person dependencies left, with wrong-software risk cut
Before
Every planning cycle, a program manager pulled up to eight reports and worked out, aircraft by aircraft, which software load and FAA 8130 airworthiness tag each shipment needed. Then a buyer rebuilt the supplier pegging file by hand, reapplying lead times, exclusions, and customer priorities from memory and old email threads. Bad upstream data usually didn't show up until the hardware was ready to ship.
Now
A rules engine that ingests all eight sources, assigns the software revision and 8130 tag for every order, then pegs supplier POs to customer orders with codified rules for lead times, customer priority, exclusions, and returns. When it can't verify a match it flags the row instead of guessing, so data problems surface at planning, not at the dock.
Process map
Inputs · 7
- Customer demand model
- Open sales orders and backlog
- Open POs and ship notices
- Outside processing POs
- Software configuration matrix
- On-hand inventory
- Lead times and priority rules
Automated logic
- 01Normalize and match keys
- 02Assign software revision
- 03Assign 8130 airworthiness tag
- 04Rank by customer priority
- 05Peg supplier POs to orders
- 06Flag rows it can't verify
Outputs
- Dated planning workbook
- Pegging plan for the supplier
- Exceptions list for buyers
- Data-quality flags for demand owners
In the field · October 2026
A routine monthly run flagged airline customer orders the tool couldn't match to the demand system. Instead of guessing, it left them blank and flagged them. Tracing those flags turned up four separate problems upstream:
- 01Orders stuck in an early status, so they were never assigned to a service site
- 02A BOM error that kept confirmed orders from driving any component demand
- 03A broken backlog sync that silently dropped orders from the demand model
- 04Shipsets accidentally converted to the wrong aircraft program after a schedule update
All four were fixed before the next demand refresh. Without the flags, each one would have shown up later as a missed ship date, an expedite, or parts bought for the wrong program.
Why it matters
- Hours of work each cycle now runs in minutes, so allocations refresh whenever schedules, configurations, or shortages change
- Sends the contract manufacturer accurate priorities and keeps customer commitments on track
- Catches demand-data problems at planning instead of at shipment, avoiding expedites, missed ship dates, and parts bought against bad data
- Removes a single-person dependency and lowers the risk of an aircraft shipping with the wrong software or airworthiness tag